Text added to get Marudham font files don't remove it

A+ A A-
Aliyar dam

Introduction:

The office of the Chief Engineer, WRO, PWD, Pollachi Region was formed on 05.10.1995, with its Head Quarters at Pollachi and subsequently the Head Quarters has been shifted to Coimbatore with effect from 18.05.2000. The hydraulic boundaries of Coimbatore Region includes the Parambikulam Aliyar Basin, Bhavani sub basin, Noyyal sub basin and Amaravathy sub basin, which spread over in 6 districts (i.e) Niligiris, Coimbatore, Erode, Tiruppur, part of Karur and part of Dindigul.

Organisational Structure:

There are 4 Circles and 10 Divisions, 40 Sub-divisions and 141 sections under this Region to operate, maintain and monitor the Irrigation systems besides Planning, Development, Conservation and Management of Territorial Water Resources.

Water Resources Infrastructure:

The Irrigation Network consists of 24 Dams, 81 System Tanks and 102 Non System tanks to cater to the irrigation requirements of the Agricultural command area under the respective basins.

BasinArea
Parambikulam Aliyar Basin177456 Ha
Bhavani Sub Basin106740 Ha
Noyyal Sub Basin15459 Ha
Amaravathy Sub Basin51324 Ha
Grand Total350979 Ha

Out of 350979 Hectares of total Ayacut, the system Ayacut is 342933 Hectares and the remaining 8046 Hectares comes under Non-System Ayacut

Major Schemes: